How to Maintain EV Charging Pile Infrastructure

With the gradual construction and improvement of charging pile facilities, more and more attention has been paid to the safety of charging pile. Especially the charging pile installed outdoors has high safety requirements for rain and lightning resistance. The material and construction of the charging pile need strict design and rain and high temperature protection measures.

Nevertheless, in order to ensure the safe use of ev charging piles, it is necessary to conduct regular safety checks on charging piles. Charging piles in each area need to determine the safety responsible person, and find personnel to check regularly. Inspectors can ask third-party service providers that install charging piles to sign safety agreements.

In the process of physical examination for charging pile, the first thing to check the charging pile appearance whether have damage, after check no leakage phenomenon, security door, open the charging pile module, voltage regulator equipment of charging pile, the human-computer interaction system, abrupt stop button for troubleshooting, and other important system to check whether there is loss or parts aging, timely updates and security installation. After the check is complete, charge the device to ensure its safety and availability.

EV Charger
Latest News About Max Power EV Chargers
With the gradual construction and improvement of charging pile facilities, more and more attention has been paid to the safety of charging pile. Especially the charging pile installed outdoors has hig...
Quick Charging Method for Electric Vehicle Charging Station
2023-04-20
Quick Charging Method for Electric Vehicle Charging Station
(1) Pulse charging method, this charging method not only follows the battery inherent charging acceptance rate, but also can improve the battery charging acceptance rate of electric vehicles, thereby ...
Read More
Electric Vehicle Charging Pile Communication Mode
2023-04-20
Electric Vehicle Charging Pile Communication Mode
Ev charging piles belong to the distribution network, and their communication mode is often considered together with distribution network automation. Communication is a key and difficult point in dist...
Read More
How to Install the New Energy Charging Pile?
2023-06-20
How to Install the New Energy Charging Pile?
How to install the new energy charging pile? With the popularization and promotion of new energy vehicles, the demand for new energy charging piles is also increasing. The installation of new energy c...
Read More
Contact Us
Add
No.5,Nanjiang 2nd Road, Nansha District,Guangzhou,Guangdong Province,China
No.5,Nanjiang 2nd Road, Nansha District,Guangzhou,Guangdong Province,China
manager@mxpcharger.com +86-20-28187883